RERE Group collects and processes cookies to ensure the operation of the website.
More information about cookies.

Choose which cookies you accept:
Customize cookies I consent to all cookies

Projects

Reconstruction of the underground tunnel into a pharmacy logistics center and a transition connecting of the inpatient facilities
House of Letters of the University of Latvia
Designing and building Cesis Knowledge Centre for Future Technology
Rail Baltica building design development and construction
Implementation of energy efficiency measures in the building complex of Bulduri Horticultural Secondary School
Facade restoration and restoration works at 11 Miesnieku Street, Riga
Conservation and reconstruction of chapel walls of Dobele Livonian Order Castle
Restoration of the ceiling paintings by Ansis Cīrulis in the former Ogre Sanatorium
Stage 1 of yacht harbour infrastructure construction
Reconstruction and restoration of Sigulda New Castle
Stage B1 of the second round of reconstruction of Mežaparks Open-air Stage
Reconstruction of Kemeri Elementary School, increasing energy efficiency
New building of hotel at Grēcinieku Street 25 in Riga
Construction of the museum storages complex
Riga 1st Hospital renovation works of building 14A
Manufacturing of furniture for Ādaži Primary School
Renovation of the former sanatorium "OGRE"
Facade refurbishing for a building located at 36 Brivibas Boulevard
Reconstruction works of the complex of buildings of the New Riga Theatre at Lāčplēša Street 25, in Riga
Renovation and restoration of the roof and façade of Stāmeriena Palace
Development of the technical documentation and implementation of construction works at Upes Avenue 16, Ogre
Reconstruction of the building of Jelgava State Gymnasium
Restoration of Melluzi Open-air Stage
Renovation of a building façade
Reconstruction and restoration of buildings in Jelgava Old Town
 Conservation of Cesis Castle ruins and reconstruction of the castle complex
Reconstruction of the Southern Tower of Aluksne Castle ruins
Window replacement works for the building of Riga Music School No. 3, Maskavas Street 166, Riga
2nd round renovation works of Riga Estonian Primary School building
Construction of manufacturing buildings in Valka, Varoņu Street 37A, 39A
Building 13 of Riga 1st Hospital
Pedestrian tunnel at the Central Station square
Replacement of windows of Jelgava Palace
“Interior renovation” of the Ministry of Culture of the Republic of Latvia
Sports recreation area of Karlsona park
Sports house of Jaunolaine Primary School
1st stage reconstruction works of Cesis city stadium
Reduction of greenhouse gas emissions at Ogre Secondary School No. 1
Office interior renovation works at Miera Street
Construction of depot building of Fire and Rescue Service
Designing and construction of Lindstrom Prodem textile product factory
Document management interior renovation works of the Ministry of Culture of the Republic of Latvia
Restauration of the congregation hall ceiling and second floor wall interior decoration in Riga St. Mary Magdalene"s Catholic Church
2 and 11 hull facade simplified renovations of "Riga 1. hospital"
Hospital "Gaiļezers" ambulatory part reconstruction 1st stage
Multifunctional complex ”Z-TOWERS”
Rebuilding and reconstruction of the Kuldigas music school
Building replanning and construction of annex in Jēkaba Street 6/8 in Riga