RERE Group collects and processes cookies to ensure the operation of the website.
More information about cookies.

Choose which cookies you accept:
Customize cookies I consent to all cookies

Projects

New building of hotel at Grēcinieku Street 25 in Riga
Construction of the museum storages complex
Riga 1st Hospital renovation works of building 14A
Changing surface of the parking area and creating waterproofing
Facade refurbishing for a building located at 36 Brivibas Boulevard
Reconstruction works of the complex of buildings of the New Riga Theatre at Lāčplēša Street 25, in Riga
Renovation and restoration of the roof and façade of Stāmeriena Palace
Reconstruction of the building of Jelgava State Gymnasium
Restoration of Melluzi Open-air Stage
Reconstruction of Stacijas Street and Dāņu Street in Tukums
Renovation of a building façade
Reconstruction and restoration of buildings in Jelgava Old Town
 Conservation of Cesis Castle ruins and reconstruction of the castle complex
Reconstruction of Skolas Street and Upes Street in Dobele
Window replacement works for the building of Riga Music School No. 3, Maskavas Street 166, Riga
2nd round renovation works of Riga Estonian Primary School building
Reconstruction of Pleskavas Street in Aluksne, Aluksne region, 2nd and 3d stage
Building 13 of Riga 1st Hospital
Reconstruction of Brūkleņu Street in Marupe
Reconstruction of Stacijas Street in Livani
Pedestrian tunnel at the Central Station square
“Interior renovation” of the Ministry of Culture of the Republic of Latvia
1st stage reconstruction works of Cesis city stadium
Reconstruction of Ganību Street and Rūpniecības Street in Aluksne
Reduction of greenhouse gas emissions at Ogre Secondary School No. 1
Office interior renovation works at Miera Street
Water supply restoration in Jaunmarupe village, 1st stage
Reconstruction of culvert at the intersection of Lielā Street and Asteru Street
Construction of rainwater sewer collector at Atpūtas Street and Liepājas Street
Construction of Ķekava primary school, stage III, infrastructure works
Hospital "Gaiļezers" ambulatory part reconstruction 1st stage
Reconstruction of Rīgas Street in the stage from ”Silava” to railway crossing, Salaspils
Multifunctional complex ”Z-TOWERS”
Rebuilding and reconstruction of the Kuldigas music school
Reconstruction and restoration of residential building