RERE Group collects and processes cookies to ensure the operation of the website.
More information about cookies.

Choose which cookies you accept:
Customize cookies I consent to all cookies

Projects

Reconstruction of the underground tunnel into a pharmacy logistics center and a transition connecting of the inpatient facilities
House of Letters of the University of Latvia
Construction of the State Fire and Rescue Service station
Rail Baltica building design development and construction
Building 13 of Riga 1st Hospital
Pedestrian tunnel at the Central Station square
“Interior renovation” of the Ministry of Culture of the Republic of Latvia
1st stage reconstruction works of Cesis city stadium
Reduction of greenhouse gas emissions at Ogre Secondary School No. 1
Office interior renovation works at Miera Street
Designing and construction of Lindstrom Prodem textile product factory
Document management interior renovation works of the Ministry of Culture of the Republic of Latvia
Restauration of the congregation hall ceiling and second floor wall interior decoration in Riga St. Mary Magdalene"s Catholic Church
2 and 11 hull facade simplified renovations of "Riga 1. hospital"
Hospital "Gaiļezers" ambulatory part reconstruction 1st stage
Multifunctional complex ”Z-TOWERS”
Rebuilding and reconstruction of the Kuldigas music school
Building replanning and construction of annex in Jēkaba Street 6/8 in Riga
Reconstruction and restoration of residential building
Restoration of an astrolabe and renovation of a housetop of the southern end wall of the Museum of the History of Riga and Navigation building
Pauls Stradins Clinical University Hospital, Block A
Simplified renovation works of building for accommodation of the pre-school education institution ”Ābelīte”