RERE Group collects and processes cookies to ensure the operation of the website.
More information about cookies.

Choose which cookies you accept:
Customize cookies I consent to all cookies

Projects

Rail Baltica building design development and construction
Reconstruction and restoration of Cesvaine Castle, 3rd round
Renovation of the facade, increase of energy efficiency for the building of Līgatne pre-school educational institution
Expansion of water management networks in Jurmala, Priedaine - Sloka
Expansion of water management networks in Jurmala, Bulluciems-Bulduri
Expansion of water management networks in Jurmala, Dzintari-Majori
Building 13 of Riga 1st Hospital
Reconstruction of Brūkleņu Street in Marupe
Pedestrian tunnel at the Central Station square
“Interior renovation” of the Ministry of Culture of the Republic of Latvia
1st stage reconstruction works of Cesis city stadium
Reconstruction of Ganību Street and Rūpniecības Street in Aluksne
Reduction of greenhouse gas emissions at Ogre Secondary School No. 1
Office interior renovation works at Miera Street
Water supply restoration in Jaunmarupe village, 1st stage
Document management interior renovation works of the Ministry of Culture of the Republic of Latvia
Reconstruction of culvert at the intersection of Lielā Street and Asteru Street
Construction of rainwater sewer collector at Atpūtas Street and Liepājas Street
Construction of Ķekava primary school, stage III, infrastructure works
Restauration of the congregation hall ceiling and second floor wall interior decoration in Riga St. Mary Magdalene"s Catholic Church
2 and 11 hull facade simplified renovations of "Riga 1. hospital"
Hospital "Gaiļezers" ambulatory part reconstruction 1st stage
Reconstruction of Rīgas Street in the stage from ”Silava” to railway crossing, Salaspils
Multifunctional complex ”Z-TOWERS”
Rebuilding and reconstruction of the Kuldigas music school
Building replanning and construction of annex in Jēkaba Street 6/8 in Riga
Reconstruction and restoration of residential building
Restoration of an astrolabe and renovation of a housetop of the southern end wall of the Museum of the History of Riga and Navigation building
Expansion of water supply and sanitation networks in Melluzi – Asari
Simplified renovation works of building for accommodation of the pre-school education institution ”Ābelīte”