Reconstruction of the road C-13 (stage from Stīpnieku Street to Dzirnieku Street)
Contractor
RERE Vide
Year of commissioning
2018
Construction status
Completed
Road covering:
- Hot asphalt covering (hot asphalt AC11 surf, SII; h=4cm, hot asphalt AC32 base,SIII; h=8cm)
- Road width: 7.00 m
- Road length: 1,534 m
- Construction of local drainage pipe: 1,474 m
- Construction of culverts: 9 pcs.