Expansion of water supply and sanitation networks in Melluzi – Asari

Customer

Ltd. "Jūrmalas ūdens"

Contractor

Full partnership "Norma OC"

Object type

Infrastructure

Address

Melluzi, Asari, Jurmala

Year of commissioning

2016

Construction status

Completed

Description of performed works:

1. External water supply and sewage networks and buildings constructed in Asari:

  • External water supply networks (OD32-110), incl. service pipes, total length - 4,560.10 m
  • External self-propelled household sewage networks (OD160-315), incl. service pipes, total length - 6,287.60 m
  • External household sewage pressure main (OD160), total length – 557.6 m
  • Household sewage pumping station Q=12.00 l/s (43.2 m3/h)
  • Integration of the constructed household sewage pumping station control system into the existing control system (SCADA)
  • Asphalt concrete covering of the carriageway, total area – 9,592.60 m2
  • Asphalt concrete covering of the sidewalk, total area – 448.90 m2
  • Gravel covering, total area – 11,252.70 m2
  • Green area (lawn) with area 13,812.50 m2
  • Concrete pavement – 499 m2
  • Concrete covering – 194.60 m2
  • Concrete edges of the carriageway or sidewalk – 433.10 m

2. External water supply and sewage networks and buildings constructed in Melluži:

  • External water supply networks (OD32-110), incl. service pipes, total length - 2,218.66 m
  • External self-propelled household sewage networks (OD160-315), incl. service pipes, total length - 1,364.29 m
  • Asphalt concrete covering of the carriageway, total area – 3,101.04 m2
  • Asphalt concrete covering of the sidewalk, total area – 20.40 m2
  • Gravel covering – 3,287.19 m2
  • Green area (lawn) – 2,841.59 m2
  • Concrete pavement – 54.50 m2
  • Concrete edges of the carriageway or sidewalk – 54.50 m

 