Within the framework of water management network expansion works in Jurmala (Section Dzintari – Majori), it is planned to build the following:

• 11.6 km of water supply network,

• 12.1 km of self-flowing sewerage network,

• 0.8 km of sewerage pressure pipeline,

• 1 sewage pumping station,

• asphalt concrete pavement construction works in the amount of approximately 30,950 m2.