Dubulti Culture and Education Centre

Contractor

PA “SIA “RE&RE” un SIA “RERE MEISTARI”

Year of commissioning

2018

Construction status

Completed

Construction works at the site are divided into two rounds:
1st round: Jurmala Central Library. In this round, the reconstruction and extension of the existing two-floor building will be implemented – the existing one-floor extensions will be replaced with a two-floor glass part of the building, adapting it to the needs of the Central Library. 

  • Number of floors – 2
  • Building area – 829.70 m2
  • Total area – 1,258.48 m2
  • Area of floors – 1,514.26 m2
  • Construction volume - 5,500 m3

2nd round: Jurmala Music Secondary School. In this round, a modern new building of music school will be constructed.

  • Number of floors – 3.5
  • Building area – 1,474.1 m2
  • Total area – 3,406.72 m2
  • Area of floors – 4,833.56 m2
  • Construction volume - 18,510 m3