1st stage reconstruction works of Cesis city stadium

Customer

Cesis Regional Municipality

Contractor

PS „RERE VIDE 1”

Designer

SIA "BM-PROJEKTS"

Object type

Reconstruction

Address

Bērzaines street 5, Cesis

Year of commissioning

2017

Construction status

Completed

The following objects will be constructed in the 1st stage of the project:• track and field stadium with a football field and running track around it;

  • road, car parking lot, pedestrian walkways and areas;
  • main external engineering networks;
  • tennis, basketball and volleyball courts;
  • playground for children and multi-play playground;
  • gymnastics area and related improvement;
  • fence of the territory;
  • construction of the constructive stage;
  • construction of the drainage system;
  • construction of the rain sewerage system;
  • construction of low-voltage networks (video surveillance);
  • construction of lighting;
  • construction of the water supply network;
  • construction of the household sewerage network.

Technical indicators:

  • water pipe – 167.3 m
  • household gravity sewerage – 193.3 m
  • rainwater sewerage – 677.0 m
  • drainage networks – 2,031.9 m
Back to project list